Curb Cut Permits

Curb cut information

Only a registered contractor can apply for a curb cut permit.  The total permit is $500 ($150 fee, $350 deposit).  An inspection is required when the project has been formed and before the concrete is poured.  A second inspection will be made after the concrete has been poured.  Allow a reasonable amount of time before the inspection is needed.   Contact the Engineering Department when the work has been completed.  A final inspection will be made 30 days later (weather permitting).  The site must be leveled and grass planted or sod laid.  When the work has been approved, the refund will be processed.